Hajj Departure Operations — Decision-Support Dashboard

A decision-support dashboard I built on my own initiative in three days, with Google Sheets, Looker Studio and Canva. It turned each scheduled departure into timed operational milestones and ran on a large screen at the service centre during Hajj 2026.

The original Arabic-language departure dashboard from Hajj 2026, showing four colour-coded departure stages with countdown timers, the current flight, overall departure progress and the upcoming flights.
Original operational dashboard — Hajj 2026. Historical data displayed for demonstration purposes.Select the image to enlarge it and inspect the details.

Origin

Nobody asked for this dashboard. A printed flight schedule would have met the basic requirement. I saw an opportunity to improve departure coordination, operational awareness and deadline management, so I designed and built a centralized digital dashboard that turned each scheduled departure into actionable operational milestones.

Context

In the 2026 Hajj season I was pre-arrival operations lead at Morocco Centre 3 for Rawaf Mina, a centre serving about 3,300 pilgrims. I led passport and administrative readiness and supervised the passport and administration team, part of a centre staff of about 22. Each departing flight brought its own chain of deadlines, from printing the bus authorizations to delivering pilgrims to the departure checkpoint on time.

How it works

The dashboard follows each flight through four operational stages, each with a deadline calculated automatically and a live countdown:

  1. Bus authorization printingPrinting the authorization for the flight’s buses.
  2. Suggested bus arrival at the hotelWhen the buses should reach the hotel.
  3. Bus departure from the hotelWhen the buses must leave with the pilgrims.
  4. Arrival at the sorting and departure checkpointThe final stage before the flight.

Each stage is colour-coded, and its label shows the level of urgency, from advisory to very critical, so anyone looking at the screen can see which deadline needs attention first.

Around the stages, the dashboard shows:

  • The current flight: airline and logo, pilgrim count and the number of buses required
  • The upcoming flights, with their pilgrims, buses and countdowns
  • Overall departure progress, with departed, remaining and in-process pilgrims
  • Supporting hotel, bus and operational reference information
  • Gregorian and Hijri dates, and the time of the last update

Architecture

Google Sheets served as the operational backend, organized into seven connected worksheets:

  • Flights: the flight records
  • Settings: configuration
  • Dashboard_Data: calculated operational information
  • Status_Update: status management
  • Active_View: the departure in progress
  • Upcoming_View: the departures that follow
  • Progress_View: overall progress reporting

Looker Studio connected these worksheets to the visual dashboard. I designed the layout, graphical elements and static text in Canva.

Automation

Once the flight schedules and settings were in place, the dashboard ran automatically. My routine manual step was to change a flight’s status from pending to completed in Google Sheets. The dashboard then advanced to the next flight and displayed its information.

This kept the decision that a departure was complete in human hands, while the move from one departure to the next was automatic.

Deployment and ownership

Unlike TrustEntry, this was an operational system, deployed and used during Hajj 2026. It was displayed on a large television in the entrance and common area of the service centre, giving staff and management a shared view of departure operations.

I was solely responsible for it: its conception, development, configuration, maintenance and operational updates.

Development

I built the entire system in three days. That covered the data structure in Google Sheets, the spreadsheet calculations, the operational logic and automation, the visual design, the dashboard configuration and the final presentation.

What it demonstrates

The project brought together independent initiative, operational planning, data modelling, workflow automation and business intelligence. It also called for deadline management and awareness of operational risk, expressed as stages and urgency levels, and information design that a busy team could read at a glance. Throughout, it relied on practical tools rather than custom software.